RG Construction was chosen as a Major Trade Partner on Advocate Aurora Health’s IPD project because of our preconstruction capabilities and operational excellence. The Lutheran General Surgery Modernization project consists of 8 new operating rooms, new staff lounge and POCU areas, built in 4 phases within a functioning hospital. Each main phase was broken into varying number of smaller phases to facilitate construction within the hospital. RG participated in all aspects of the design process providing continuous budgeting and cost information to establish the Target Cost for our scope of work. Particular attention was given to the logistics (ICRA standard temporary partitions), operating room acoustics and the operating room ceilings. In conjunction with other major trade partners, RG coordinated, built off-site and installed prefabricated head wall units for the new POCU area. RG used BIM capabilities to fully model and coordinate our assemblies with our other trade partners to LOD 400. The prefabricated section were built off site at the electrical trade partner shop, delivered to the site and installed. Due to having to route through hospital and various clearances, each headwall was fabricated in two sections, inclusive of framing, in-wall backing and MEP components.
Chicago Area
936 North Larch Ave Elmhurst, IL 60126 (630) 782-0180
Central Illinois
148 Thunderbird Lane East Peoria, IL 61611 (309) 282-8500